Cape Coral separates freshwater canal shorelines from tidal ones, and the freshwater rules are specific and measurable.
- Engineering Design Standard Sheet H-3, "Seawalls — Freshwater Canal Alternate", sets minimum standards for alternatives to vertical bulkheads in freshwater systems only.
- Maximum allowable slope to the waterline is 4 horizontal to 1 vertical (4:1); the standard notes 3:1 maximum at the property line.
- Maximum water depth at the property line is 6 inches.
- In freshwater canal systems concrete ramps may be constructed at a maximum width of 20 feet, extending no more than 15 feet into the water from the property line.
- All plans must be sealed by a professional engineer registered in Florida.
- Culvert pipe cannot extend more than 4 inches from the face of a seawall into the canal right of way.
- The distance shown between the beginning of the slope and the property line is to be read as 15 feet minimum.
Read carefully: These are the freshwater alternative standards. They do not describe requirements for tidal shorelines in the same city.